← Eray Balat
Real estate · Alphan İnşaat · Kayseri

Aydınlıkevler 175

Selling a building before it exists

On shoot day the site was an empty plot and a concrete frame. Ten days later the same spot stood finished on screen, with the tram passing by at night. Two 30-second vertical ads, built from a location shoot, the developer's model in 3D and AI, without touching the architecture.

  • 2 films · 30 s · 9:16
  • Live action + 3D + AI
  • Real-scale 3D tram
  • November 2026
▶ Watch both filmsHow we built it
Shoot day → 2028, one shot
Client
Alphan İnşaat
Project
3 detached + 4 terraced blocks
Delivered
2 vertical ads, 1080×1920
Made for
Reels, Stories, Meta ads
Studio
Citrine Studio
The films

Two films, two promises

Each film sells one block type and carries the whole campaign in 30 seconds: the finished building, the location and the tram line, an interior from the apartment plans, the payment plan and a way to call. Both are fronted by the developer: the company's own representative speaks to camera, and the voice-over is the same voice.

Sound on · 0:32

Film 1 · 3 detached blocks · handover end of 2027“This key could be yours”

Built on one motif: the branded key in the developer's hand. One unbroken camera move starts on the empty site, circles the building as it rises floor by floor and lands on the representative. Then the real drone shot of the site turning into finished blocks, the tram stop, the interior and a closing invitation from the site itself: “Come, let's choose your new home together.”

Sound on · 0:30

Film 2 · 4 terraced blocks · handover summer 2028“Your 2028 home, at today's price”

A film about time. The representative stands in front of today's concrete frame and never moves, while the building behind rises into its 2028 self in the same shot, without a cut. Then the blocks and the tram line from above, the façade, 2.5+1 flats of up to 100 m², the boulevard, and both tram lines at night with double sets.

The brief

Four problems in one frame

Alphan İnşaat wanted two Instagram ads for its project in Aydınlıkevler, Kayseri: one for the 3 detached blocks, one for the 4 terraced blocks. Each had to stop the scroll in the first second, show the buildings finished and carry the campaign. Four things stood in the way.

The building isn't there yet

On shoot day the site was an empty plot and a concrete frame. The product being sold wasn't in the picture.

The architecture can't drift

AI models redraw a building a little differently every time. What the client sells is that façade, that floor count, that plot.

The location's ace: the tram

A tram line runs right past the project. AI kept putting the tram in the wrong lane, at the wrong size, and broke the building on the way.

30 seconds, vertical

Finished building, location, interiors, payment plan, price and contact, all readable on a phone screen and all inside 30 seconds.

Before and after

Same frame. Before the building, and after.

Left of each pair is what the camera really saw on 9 November 2026; right is what the client is selling. Angle, street and skyline stay the same. Only the building changes, and it changes into the architect's design, not a guess.

The developer's representative in front of the concrete frame on shoot day
Shoot day · the frame
The same shot with the finished 2028 building
Same shot · 2028
Real drone shot of the construction site and the tram line
Real drone · the site
The same drone shot with the finished blocks
Same drone shot · finished

The pairs are not pixel-identical because the after shots move, so they sit side by side rather than under a slider. In the drone shot, the advertising wrap already on the passing tram was replaced with Alphan's own.

How we built it

A hybrid pipeline, built for accuracy

A sales film can't afford AI's habit of redrawing a building a little differently every time: the floor count drifts, the façade changes, the building slides off its plot. So the work was set up the way a visual effects shot is set up, with the real footage and the real architecture as fixed points and AI working between them.

Live action on location

Half a day on site: 11 drone and 15 ground takes at 50 fps, the ground camera turned on its side for native vertical framing. The developer's representative speaks the opening and closing lines to camera, and the voice-over is the same voice, so the ad sounds like the company itself. Camera and drone: Fatih Bozkırlı.

Architecture first, in 3D

We rebuilt the developer's 3D model in Blender, completed the missing blocks from their renders and took every storey height from the floor plans. Then the model was matched to the camera of the real drone footage, so the building stands on its true plot, at its true height, before AI touches a single pixel. Most exterior shots were generated from these guide frames.

AI on rails

Finished façades, pavement and tram-stop life, interiors and the shift from day to night were generated with AI, held to the developer's 13 renders and the plans of 5 apartment types. AI adds light and life; it never decides where a wall goes.

3D wherever AI can't be trusted

The tram is the project's strongest selling point, and AI put it in the side lane instead of on its grass track, drew it too big and changed the building on the way. So we modelled it at real scale, solved the camera of each AI shot frame by frame and composited the tram onto its own rails.

The pipeline, shot by shot
  1. Location platedrone + ground camera, 50 fps
  2. 3D layoutBlender, storeys from the floor plans
  3. Camera matchmodel locked to the drone shot
  4. Clay guide framesposition, height, floor count fixed
  5. AI generationKling 4.0 Omni · Seedance
  6. UpscaleReal-ESRGAN to 1080p
  7. Tram camera solvePython, half-pixel accuracy
  8. Cycles render + compositemotion blur, shadow, occlusion
  9. Edit · graphics · soundPremiere Pro · After Effects
Behind the scenes · 1

The building, locked to reality

Left alone, AI redraws the building on every generation. To stop that, the developer's model was built in Blender and matched to the camera of the real drone footage. AI then worked from these guide frames, so the building's position, height and floor count stayed tied to the real thing.

9 Nov 2026: the empty plot, Mount Erciyes behind.
Plate · real drone9 Nov 2026: the empty plot, Mount Erciyes behind.
The model in the matched camera, over the real footage.
Clay pass · same cameraThe model in the matched camera, over the real footage.
The frame the AI shot was generated from.
Guide frame · finished 3DThe frame the AI shot was generated from.
The developer's renders next to our 3D model
Architectural fidelity. The developer's renders on the left, our 3D model on the right: arched bays, brick bands, ground-floor shops. Their model had one detached block; the missing two were completed to match the layout in the renders.
Box-figure previsualisation of the opening shot in Blender
Previsualisation. Film 1's opening move, from the empty site up around the building and down to the representative, was blocked out with box figures and timed in Blender before anything was generated. The AI then followed that camera.
Behind the scenes · 2

The tram, built instead of generated

The approved AI shot was never touched. The tram was rendered as a separate 3D layer and composited on top, so the architecture the client signed off on stays exactly as it was.

No tram, building untouched.
Clean plate · approved AI shotNo tram, building untouched.
Real-scale tram, rendered separately in Blender.
CG layer · CyclesReal-scale tram, rendered separately in Blender.
Composited with light and shadow.
Final compositeComposited with light and shadow.

Camera solve

The camera motion of each AI shot was solved frame by frame, tracking kerb lines and pole bases to half-pixel accuracy.

The right line

The poles were measured and the rails laid with at least half a metre of clearance, so no tram ever runs through a pole.

Real scale

Modelled to the dimensions of Kayseri's tram: 32.6 m long, 2.65 m wide, as single and double sets.

Render

Rendered in Cycles with motion blur and a shadow on the ground, passing correctly behind the poles, wires and trees in front of it.

Night

Lit interiors, passenger silhouettes in the windows, a darker roof and reflections, with no false shadow on the road.

Flexibility

Day and night versions, different framings and line-ups. After review the tram runs more often: in three scenes, and with double sets on both lines at night.

Why it mattersAI is fast, but it picks the position and size of a moving object on its own. In a sales film, a tram in the wrong lane or running through a pole breaks trust. The hybrid route pairs the speed of AI with the precision of 3D.

Process

Storyboard to delivery in 23 days

26clips from half a day on site: 11 drone, 15 ground
13 + 5developer renders and apartment types, followed to the letter
32.6 mtram, modelled to Kayseri's real dimensions
½ pxcamera solve accuracy on the tram shots

Timeline

  1. 23 OctProposal: a separate film for each block type.
  2. 27 OctStoryboard approved: scene flow and style locked with the client.
  3. 9 NovHalf-day location shoot: drone and ground camera, with the developer's representative.
  4. 10–15 Nov3D model and camera match, AI generation, edit, graphics, music and sound.
  5. 16 NovFilm 1 delivered.
  6. 17–19 NovFilm 2, the 3D tram scenes, the revision and delivery.

In every film

  • ~30 s, vertical 1080×1920, cut for Reels, Stories and ads
  • Voice-over and on-camera lines in the developer's own voice
  • Campaign titles: location, flat type, payment plan, fixed-price guarantee
  • Music, ambience and transition sound design: tram, construction, key
  • Logo end card and WhatsApp line

During the edit, day and night tram versions and extra interior and evening scenes were prepared, so the cut stayed flexible.

Toolkit

Shoot
Drone (1080p, 50 fps) and ground camera turned for vertical (50 fps)
3D
Blender: clay frames and camera matching, Cycles for the tram; Python for the camera solve and compositing
AI
Kling 4.0 Omni and Seedance through Magnific (video); Real-ESRGAN upscaling to 1080p
Edit, graphics, sound
Premiere Pro, After Effects; music and sound effects
Frames

From the films

The empty site, the opening of Film 1The building rising floor by floorThe developer's representative with the keyThe tram stop in front of the blocksAn interior from the apartment plansThe building rising behind the representativeThe blocks and the tram line from aboveThe façadeA 2.5+1 flat interiorThe blocks and the 3D trams at nightShoot day: the concrete frameThe same shot in 2028
For developers

Selling a building that isn't built yet?

If your project is still a construction site, we can film it as the finished place: true to your architecture, set in the real street, cut for the phone screen. For developers, agencies and sales offices that start selling while construction is under way. Write a few lines about the project and you'll hear back within 24 hours.

Write to Eray →See all work
ClientAlphan İnşaatProductionCitrine Studio · Eray BalatShoot & droneFatih BozkırlıYear2026